Scope of works includes new construction of a motorway in total length of 7.62 km with dual carriageway and stop lane. All additional construction elements were included in the works, such as: drainage, dislocation of existing utilities, traffic signs, environment protection measures, traffic management during construction, as well as the interchanges Tabanovce and Rechica with a 27 m long bridge and overpass of 42m.
Ministry of Transport and Communications http://mtc.gov.mk/
Infrastructure Project