Albania Tirana ariport supervision and design

Awesome Image
Awesome Image
Awesome Image

Project Description

Supervising services provide technical and administrative assistance in the supervision of the construction works, control and taking measurements for implementation of the project in given financial and timely frames.

Project Challenge

It was requested DIWI to manage and execute supervision over the construction works under conditions given in the first issue of FIDIC, 1999. The conditions for Designing executed according to the conditions given in FIDIC Red Book will also be usable for the extension of the exit A. Works include: Structures for new terminal with area 4.092, 00m2 and 7.680, 00m2, Phase 2: Building for airport equipment, Terrain for fuel supply, Drainage channel, Structure for safely and dangerous waste, Station for fire rescuing, Extending and extension of the stand and ‘A” exit, access road of approx. 6.6km with 4 bridges with total length of approx. 300m.

What We Did

Result

Project Info

Design check, control, supervision over the construction works, administrative services. Control of the final design and supervision executed in accordance with the Contract for concession as well as according to the Albanian law. The supervision on the method and progress of the construction works if they are in accordance with the safety measurements on terrain, control of the proper installation of technical equipment, proper storage and maintenance of the materials, proper use of machines and apparatus, as well as managing with administrative data. In the project is also included demolition of several structures as well as connection of the other structures with drainage, sewage and connection to the power supply network. DIWI Makedonija was responsible for roads infrastructure design check and provision of additional design drawings and modifications of the design drawings as needed during the execution of the works on the roads infrastructure.

Clients

International Airport Tirana

Categories

Design and Supervision

Completed

01.05.2008 - 09.2009

Project Budgets

€16.05 mil